RESUME
with
a heavy emphasis on underground utilities,
earthwork, paving and grading
Excellent written and verbal
communication skills
Expert computer user after spending
six+ years in the computer industry, giving
me the ability to learn any software very
quickly, with extensive experience in:
Master Builder, Timberline
Estimating, Hard Dollar, Soft Plan,
Photoshop, Project, Word, Excel, and
countless others
Money saver in the office, money
maker in the field
Versatile, fast learner, energetic,
loyal, dependable, detailed, spirited, and
dollar conscious
Professional Experience
KSA Engineers / Wisenbaker, Fix and
Associates
Tyler, TX
Resident Project Representative
May ••••• - Current
Provide onsite inspection and
reporting services on behalf of
owner/municipality and engineer for water
and wastewater treatments plants,
underground utilities, and paving projects.
Ensure contractor meets or exceeds
plans and specifications through
observation and testing.
Geaux Corporation
Tyler, TX
Estimator / Project Manager /
Superintendent
June ••••• May •••••
Oversee civil, commercial, and
residential projects ranging from $•••••,•••••
to $•••••,•••••,•••••, with a heavy emphasis on
underground utilities, earthwork, paving,
and grading
Perform quantity take-offs of all
construction plans and provide value
engineering when possible
Prepare estimates, proposals,
schedules and set budgets using material,
labor, equipment, subcontract, overhead,
profit and other soft costs
Developed production
rating/tracking system and maintain for
future estimating
Provide daily, weekly and monthly
reports to owner and upper management,
including schedules, production, cost to
complete, gross income, and city/engineer
correspondence
Negotiation of vendor and
subcontractor pricing, including regular
price updates
Implementation of estimating,
purchasing and accounting policy and
procedures
Resident expert of Master Builder
accounting, project management and
estimating software
Supervise up to five crews
installing sanitary sewer, storm drainage,
earthwork, lot grading, street grading,
concrete curb & gutter and asphalt paving
Establish and maintain good rapport
with engineers, architects, inspectors and
subcontractors
Four D Construction
Balch Springs, TX
Estimator / Project Coordinator
June ••••• May •••••
Prepare awarded projects for
construction of water, sanitary sewer, and
storm drainage systems
Oversee as many as ••••• projects at a
time
Review executed contracts to
determine owner, engineer and contractor
responsibilities and took appropriate
action to ensure compliance
Ensure that all permits are
acquired per local, state and federal
guidelines
Negotiate vendor and subcontractor
pricing to maximize profit
Prepare and execute job cost budget
Issue purchase orders and work
orders to vendors and subcontractors
Estimate water, sewer, and storm
drain material quantities based on plans
and specifications for municipal,
corporate, and privately owned developments
Gather vendor and subcontractor
quotes to be used in bidding process
Reviewed several estimating
packages including Hard Dollar, HCSS,
Timberline, Quest, and Bid2Win, and
presented results to owner for selection
and purchase
Geaux Corporation
Tyler, TX
Construction Administrator
July ••••• May •••••
Forecast and schedule work to be
performed by superintendents,
subcontractors, and small crew for
residential & commercial builder
Responsible for scrutiny and
execution of all company purchases
Developed purchase order policies
and procedures, including manuals, forms,
etc.
Estimated material quantities based
on blueprints and SoftPlan to be used for
purchasing
Management of small field crew of
five
Maintained strong working
relationship with vendors and
subcontractors for bidding and pricing
Administrator of •••••workstation
computer network
Recent Project History
Scenic Loop Sewer Line Replacement
Hawkins, TX
Value: $•••••,•••••
Resident Project Representative
Oversee and inspect installation of
new 6 SDR••••• sanitary sewer and
abandonment of existing 6 VCP
Role Engineer Representative
•••••
•••••,••••• Gallon Elevated Storage Tank
Mineola, TX
Value: $1,•••••,•••••
Resident Project Representative
Oversee and inspect fabrication,
erection, and coating of •••••,••••• gallon
spheroid water tower
Role Engineer Representative
•••••
Waste Water Treatment Plant Improvements
New Waverly, TX
Value: $•••••,•••••
Resident Project Representative
Oversee and inspect replacement of
clarifier equipment, fixed aerator,
floating aerator, and polymer/chlorine
system
Role Engineer Representative
•••••
Water and Sanitary Sewer for Truck Stop
New Waverly, TX
Value: $•••••,•••••
Resident Project Representative
Oversee and inspect installation of
new 8 PVC water line, lift station, 8
sanitary sewer, 6 sanitary sewer, and 4
force main across IH•••••
Role Engineer Representative
•••••
Broadway Hills Plaza
Tyler, TX
Value: $•••••,•••••
Estimator / Project Manager
Retail Shell •••••,••••• SF
Scope Steel frame building with
EIFS veneer, ready for tenant finish
Role General Contractor - •••••
Oakgrove Family Practice
Baton Rouge, LA
Value: $1,•••••,•••••
Estimator / Project Manager
Medical Building included ••••• SF
Scope Stick frame building,
finished
Role General Contractor •••••
•••••
Harpers Ridge Unit III
Tyler, TX
Value: $2,•••••,•••••
Estimator / Project Manager
Seventh phase of Cumberland Gap
included development of ••••• residential
lots
Scope Clearing, grubbing, rough
excavation, wet utilities, street
excavation, dry utilities, road base,
paving, finish grading
Role Owner / Developer / General
Contractor •••••
Elk River Unit I
Tyler, TX
Value: $2,•••••,•••••
Estimator / Project Manager
Sixth phase of Cumberland Gap
included development of ••••• residential
lots
Scope Clearing, grubbing, rough
excavation, wet utilities, street
excavation, dry utilities, road base,
paving, finish grading
Role Owner / Developer / General
Contractor •••••
Commerce Centre
Baton Rouge, LA
Value: $•••••,•••••,•••••
Estimator / Project Manager
Included development of •••••
commercial lots
Scope Clearing, grubbing, rough
excavation, wet utilities, street
excavation, dry utilities, road base,
paving, finish grading
Role Developer / General
Contractor •••••
West Cumberland Road
Tyler, TX
Value: $2,•••••,•••••
Estimator / Project Manager
Fifth phase of Cumberland Gap
included development of 2 residential lots
and ••••• commercial lots
Scope Clearing, grubbing, rough
excavation, wet utilities, street
excavation, dry utilities, road base,
paving, finish grading
Role Owner / Developer / General
Contractor •••••
Acadia Place Unit V
Tyler, TX
Value: $2,•••••,•••••
Estimator / Project Manager
Fifth phase of Acadia Place
included development of ••••• residential lots
and 1 commercial lot
Scope Clearing, grubbing, rough
excavation, wet utilities, street
excavation, dry utilities, road base,
paving, finish grading
Role Owner / Developer / General
Contractor •••••
Roselawn Memorial Park
Tyler, TX
Value: $1,•••••,•••••
Superintendent
First phase of cemetery included •••••
acres of cemetery spaces with curb and
gutter, asphalt paving, irrigation,
landscaping, and sales office
Scope Clearing, grubbing, rough
excavation, wet utilities, street
excavation, dry utilities, road base,
paving, finish grading
Role Owner / Developer / General
Contractor •••••
Blue Mountain Unit I
Tyler, TX
Value: $5,•••••,•••••
Superintendent
Fourth phase of Cumberland Gap
included development of ••••• commercial lots
and 1 multi-family residential lot
Scope Clearing, grubbing, rough
excavation, wet utilities, street
excavation, dry utilities, road base,
paving, finish grading
Role Owner / Developer / General
Contractor •••••
Rockpoint Unit I
Tyler, TX
Value: $1,•••••,•••••
Superintendent
Third phase of Cumberland Gap
included development of ••••• residential lots
Scope Clearing, grubbing, rough
excavation, wet utilities, street
excavation, dry utilities, road base,
paving, finish grading
Role Owner / Developer / General
Contractor •••••
Harpers Ridge Unit II
Tyler, TX
Value: $•••••,•••••
Superintendent
Second phase of Cumberland Gap
included development of ••••• residential lots
Scope Clearing, grubbing, rough
excavation, wet utilities, street
excavation, dry utilities, road base,
paving, finish grading
Role Owner / Developer / General
Contractor •••••
Harpers Ridge Unit I
Tyler, TX
Value: $•••••,•••••
Superintendent
Groundbreaking phase of Cumberland
Gap included development of ••••• residential
lots
Scope Clearing, grubbing, rough
excavation, wet utilities, street
excavation, dry utilities, road base,
paving, finish grading
Role Owner / Developer / General
Contractor •••••