HSE Manager

Glasgow, KY 42141 • 480 mi.
Job Function:
Construction & Extraction, Engineering
Email
•••••
Phone
•••••
Member No.
19532105
You're viewing this profile in preview mode.

Upgrade to Premium Search to see:

  • Names
  • Headshots
  • Email
  • Phone
  • Career Portfolios
  • Key Dates
  • Numbers
  • and much more!
Employment Type:
No Preference
Experience:
21+ Years
Salary:
$50-60k
Education:
High School Diploma
Citizenship:
U.S. Citizen
Willing to Relocate:
Not Provided

RESUME

; Association
&#•••••; Association
&#•••••; Association
Training:
&#•••••; ACI level 1
&#•••••; OSHA ••••• hr.
&#•••••; Radiological safety
&#•••••; EPSC level 1
&#•••••; Asphalt Lay Down
&#•••••; Structure Inspection
&#•••••; Aggregate sampling
Publications:
&#•••••;
&#•••••;
Awards:
&#•••••;
&#•••••;
Experience Highlights:

&#•••••; I••••• reconstruction @ exit #••••• in Chattanooga TN. Responsible for bridge, culvert and barrier wall construction.
&#•••••; I••••• reconstruction in Louisville KY. Responsible for the reconstruction of ••••• bridges.
&#•••••; Greenbelt Hwy. Louisville KY. New construction. Chief project inspector responsible for all construction.
&#•••••; I••••• Rest Area. Bullitt county KY. Chief project inspector responsible for all construction.

Mr. •••••s career has centered on project inspection. Specializing in prestressed concrete bridges and concrete pavement. He retired from the state of Kentucky in ••••• after ••••• years of service. He has been with Lochner since June of ••••• He is currently in charge of structures on the I••••• reconstruction project in Chattanooga TN.


Select Projects:
&#•••••; I••••• CNF••••• this project is the complete rebuild of I••••• @ exit #••••• in Ooltewah TN. Estimated project cost is ••••• million. Estimated completion date is July ••••• Mr. ••••• is in charge of all structures on the project including four bridges, nine culverts and all barrier wall. He is also assisting in the placement of concrete pavement.
&#•••••; US••••• in Campbell county Ky. This project was the complete rebuild of US••••• changing it from a two lane road to a four lane divided hwy. with concrete pavement and lime stabilized roadbed. Project cost was ••••• million. Completion date was November ••••• Mr. ••••• was responsible for the daily inspection of the concrete paving operations.
&#•••••; I••••• Shawnee expressway in Louisville Ky. This project was a complete rebuild of the existing 8 miles of roadway and bridges. Project cost was ••••• million. Completion date was January ••••• Mr. ••••• was in charge of the bridge rebuilding. This included removal and replacement of the decks, parapet walls, and the beams on ••••• bridges.
&#•••••; Greenbelt Hwy. Louisville Ky. This was a new construction project of a four lane divided hwy. with partially controlled access. The project consisted of grade and drain, concrete pavement and twin bridges over a small creek. Project cost was 8 million. Completion date was November ••••• Mr. ••••• was the chief project inspector over all phases of construction with subordinate inspectors to help with the concrete paving.
&#•••••; I••••• Rest area. Bullitt county Kentucky. This project was for the building of a new rest area facility with concrete ramps, parking lots and sidewalks as well as the rest area buildings and extensive landscaping. Project cost was 4 million. Completion date was December ••••• Mr. ••••• was the chief project inspector on this project along with subordinate inspectors to assist in paving and utility inspection. The building inspection was a new challenge as it was unrelated to road construction. There were many different codes to be adhered to. The landscaping was vast with over ••••• trees and seedlings along with wild flower seeding. The project has become a model for other rest areas in Kentucky.
&#•••••; I••••• in Bullitt and Jefferson county Kentucky. These 8 projects were for the complete rebuild and widening of I••••• through these counties. Along with the rebuilding of various interchanges as well as side roads. The projects began in ••••• and continued through ••••• with a cost of approximately ••••• million. All of these projects were controlled by the same resident engineers office in Bullitt county. Mr. •••••s duties were to be an assistant to the chief project inspector. Those included all aspects of the work. Such as bridge, roadway inspection, utility relocation, surveying, material sampling and testing.

&#•••••; Resume Information Sheet

Office: Chattanooga

Resume Type (general, CSS, etc.) General

Date of Last Update: May •••••
Lochner Start Date: June ••••••••••

Years with Other Firms: ••••••••••

Education completion dates (BS•••••, MS•••••, etc.): •••••High school ••••••••••

Current Professional Registration Discipline: •••••
State: •••••
License Number: •••••
Year: •••••

Current Professional Registration Discipline: •••••
State: •••••
License Number: •••••
Year: •••••

Current Professional Registration Discipline: •••••
State: •••••
License Number: •••••
Year: •••••

Current Professional Registration Discipline: •••••
State: •••••
License Number: •••••
Year: •••••

Current Professional Registration Discipline: •••••
State: •••••
License Number: •••••
Year: •••••