RESUME
••••• E ••••• SEPTEMBER •••••, •••••
•••••
Weatherford, Tx •••••
•••••
••••• •••••
Career Objective:
Position as a cost estimator/project manager for a larger utility installation
corporation with projects at the city/county level and greater.
Summary of Qualifications:
In excess of thirty years as an estimator, bringing projects to completion within
the bid price and at a profit. Establish and set time standards for project line
items to meet designated completion dates.
Work History:
Oct. •••••, •••••Jun •••••,•••••
Patco Utilities - Grand Prairie, Texas
Estimator/Project Manager
Resposible for all phases of utility installation and developement from the
estimation of the cost of materials, labor and installation of storm water pipe,
sewer pipe and water pipe both new and rehab. Bidding and installation of
sewer lift stations, forced main and water booster stations.
Jan •••••, •••••Oct •••••,•••••
David Stocker Inc - •••••h, Texas
Estimator/Project manager
Responsible for all phases of utility installation and estimation of the cost of
materials, labor and installation of storm water pipe, water pipe and sewer pipe
new and rehab.
Jan •••••, •••••Jan •••••,•••••
Richard Carr Construction - •••••h, Texas
Estimator/Project manager
Renovation of the Texas Hotel •••••h. Responsible for storm water, sewer and
water lines new and rehab operations.
Apr ••••• •••••Nov •••••,•••••
Billy Bobs Texas •••••h - •••••h, Texas
Manager of Operations
Maintenance of new construction at Stockyards and development for Billy Bobs
Texas/Link Management Joint Venture. Managed daily maintenance and
custodial crews.
Jan •••••,•••••Mar •••••,•••••
Jolly Rancher - All of U.S.A, Texas
Manager of Operations
Manager of catering and kitchen staff. Responsible for promotions and delivery of
catered goods throughout the United States.
Aug •••••,•••••Jun •••••,•••••
Anchor Plumbing - Arlington, Texas
Owner/Operator
Responsible for daily operation of storm water, sewer and water lines new and
rehab, also for the plumbing of new homes and repair of older homes.
Education :
UT Arlington - Arlington, Texas
Educatiion Level: 2 years college, technical or vocational school.
Major: Physical Education
Minor: History
Graduated: No
Training:
Tarrant County College
South Campus - •••••h
General maintenance course detailing operation, trouble shooting and repair of
boilers, heaters, and HVAC systems.
Status: Completed
Univ. of Colorado - Ft. Collins, CO
Solar Energy Installation and Maintenance
Analysis of area to be covered, system requirements, determine proper panel
to meet present and future needs.
Status: Completed
Occupational License/Certification:
State of Texas - Austin, Texas
Master Plumber
License # M•••••
Expires: Feb •••••, •••••
Occupational Experience:
••••• Analyzes blueprints, specifications, proposals, and other ducumentation, to
prepare time, cost, and labor estimates.
••••• Computes cost factors used for preparing estimates for management and
determining cost effectiveness.
••••• Consults with clients, vendors, or other individuals to discuss and formulate
estimates and resolve issues.
••••• Prepares estimates for selecting vendors or subcontractors, and determining
cost effectiveness.
••••• Prepares estimates used for management purposes, such as planning,
organizing, and scheduling work.
••••• Prepares time, cost, and labor estimates for products, projects, or services,
applying specialized methodologies, techniques or processes.
••••• Reviews data to determine material and labor requirements, and prepares
itemized list.
Computer Skills:
Email software (outlook, etc.)
Personal Computers
Military:
United States Marine Corps Reserves •••••
Worked with support group and rescue while in HMM ••••• U.S.M.C. Airwing.
Air/Sea rescue and maintanance and supply.
KEYWORDS
pipe