Operating Engineer

Chicago, IL 60634 • 578 mi.
Job Function:
Engineering, Customer Service
Email
•••••
Phone
•••••
Member No.
36218788
You're viewing this profile in preview mode.

Upgrade to Premium Search to see:

  • Names
  • Headshots
  • Email
  • Phone
  • Career Portfolios
  • Key Dates
  • Numbers
  • and much more!
Employment Type:
No Preference
Experience:
3 – 5 Years
Salary:
$50-70k
Education:
High School Diploma
Citizenship:
U.S. Citizen
Willing to Relocate:
Any Location
Travel Preference:
No Preference
Maximum Commute:
1 Hour

RESUME



Objective

TO OBTAIN A BUILDING ENGINEER POSITION

Professional History
Trainee Engineer, Loyola
University Lakeside
••••• ••••• Present


Assisted in the operation and maintenance in the following building systems
with a ••••• academic and dorm college campus.

Boilers


Main plant (3) Johnston fire tube boilers •••••,••••• Btu HR output.
Operated at ••••• psi with Deaertor and surge tank. Cleaver Brooks Model FLX•••••
Various low pressure steam boilers , Weil-McLain, Pacific Kewanee.
Various hot water boilers, Lochinur,Unilux, Benchmark.
Various domestic hot water heaters Lochinuar,AO switch, Tecedynelars Cyclone.
Cooling systems.
Main plant 4 Trane ••••• ton water cooled chillers and use R•••••
Other building is off the main chilled water loop.
Various sized carrier AC cooled chillers that use R•••••A refrig and •••••A.
Two ••••• ton water cooled Trane chillers that use R••••• refrig. •••••A
Data center cooling. Various cooling units, Liebert, Emerson,Data Inc.
Cooling Towers, Evapco
AHUS over a ••••• different ones. Innovent, Vertrol,Mequay, Season Master American Standard,
York International Control Air Inc ••••• CFMS on small and •••••,••••• large.
Vav with and without reheating coils, Fan powered boxes and cabinet unit heaters.
VFDS, ABB, ACH •••••, ••••• Dan Foss UL7 •••••
Pheumatic controls Honewell.
BAS Delta System
Voltage familiar with •••••
Motors and pumps B&G Marathon TACO



Assisting Duties

Winter boiler rounds checking and maintaining all boilers including blow downs and water testing.
Pressure and supply and return temps
Summer cooling rounds. Checking supply and return temps

Main Duties

Punching tubes on all heating and cooling units, includes replacing gaskets, gauges, site glass and cleaning inside and out.
Air handlers, motor, pumps changed replace belts, filter, greased, and oiled all of them every 3 months as needed.
Checking and changing oil on compressors.
Cleaning exhaust and intakes
Cleaning all mechanical rooms
Cleaning and maintaining ice machines.
Cleaning cooling towers.
Cleaning Pool and spas and water testing
Cleaning and maintaining waterfall and fountains. Flushing power washing and cleaning strainers.
All dorms over ••••• Tested all equipment Fire extingshers, smoke alarms, stove,
refrigerators, ACs. Replaced as necessary
Changing balices and lite bulbs. Resetting breakers.
Fire panels simplex and Siemens and responding to troubles and fire alarms, also shutting down for contractors.
Fire equipment, maintained all extinguishers, smoke alarms and mounting and remounting.
Winterizing all chilled water coils.

.


Certifications & Training

Stationary Engineers License
CFC Universal Card
••••• hours of OSHA training••••• April 8, •••••
•••••hour seminar Electronic Damper Actuator troubleshooting•••••May •••••, •••••
•••••hour seminar Boiler Combustion Efficiency•••••March •••••, •••••
Facilities Maintenance•••••August •••••, •••••
Variable Frequency Driver•••••March •••••, •••••
Elevator Operation and Maintenance•••••May 8, •••••
Basic Boiler Operations•••••April •••••, •••••
Boiler Controls G&O Thermal•••••March 8, •••••
•••••
Education
Triton College•••••
Electricity I, II, and III
Refrigeration I, II, and III

Currently Enrolled in Following Classes

Com Eds Smart Ideas for Business Programs
Locksmith training
Plumbing Repair and Maintenance

Taft High School••••••••••

Computer Skills
Macintosh OS•••••, PowerPoint, Prep •••••, Photoshop •••••