Rigger

Lysite, WY 82642 • 1,592 mi.
Job Function:
Construction & Extraction, Other
Email
•••••
Phone
•••••
Member No.
30077001
You're viewing this profile in preview mode.

Upgrade to Premium Search to see:

  • Names
  • Headshots
  • Email
  • Phone
  • Career Portfolios
  • Key Dates
  • Numbers
  • and much more!
Employment Type:
No Preference
Experience:
21+ Years
Salary:
$30-50k
Education:
Some College
Citizenship:
U.S. Citizen
Willing to Relocate:
Not Provided

RESUME


OBJECTIVE: I am seeking employment with your company as Supervision, Rigger, Ironworker or a Boilermaker; I am confident in my abilities to fulfill and excel in these positions.

EXPERIENCE:
•••••/••••• V 3/••••• ELKHORN CONSTRUCTION ••••• Allegiance Circle Evanston, WY ••••• (•••••) •••••
Jobsite: Resolute Energy Corp. Aneth Project. Rigger: Building a new compression gas station perform my task in various rigging setting cooling towers, vessel, coolers, pipe wraps, compression skid, materials in jobsite yard and on/off shipment into worksite yard.

•••••/••••• V •••••/••••• IRWIN INDUSTRIES INC. ••••• W. Carson St. Long Beach, CA ••••• (•••••) •••••
Jobsite: APS Four Corners Power Plant in Fruitland, NM. Mechanic: Operating fork lift managing delivering/unloading materials within the jobsite, performing various rigging and structural welding, Coal Piping replaced with new materials.

•••••/••••• V •••••/••••• CCC GROUP INC. ••••• Dietrich Road San Antonio, TX ••••• (•••••) •••••
Jobsite: Drake Cement Plant Drake, AZ. Ironworker: New cement plant in construction worked on stairway structure, air preheater, crushers, furnace, and tanks. Set up forms for concrete floors structure, silo, smoke stacks and surrounding detail works. Extensive / various amount of Rigging with Structural Welding and some modification work.

•••••/••••• V•••••/••••• IRWIN INDUSTRIES INC. ••••• W. Carson St. Long Beach, CA ••••• (•••••) •••••
Jobsite: Dave Johnston Power Plant Unit ••••• Glenrock, WY. Rigger Supervisor: Unloaded materials for pre-outage, demo work on Economizer preheat panels, headers, soot blowers, platform relocation and buck stay beams reinforcements, extent of Rigging, Welding, and Bull Rigging. Wind Box and expansion, air pre-heaters and modification, with detail works.

•••••/••••• V•••••/••••• FOSTER WHEELER INC. Perryville Corp. Park Clinton, NJ ••••• (•••••) •••••
Jobsite: TEP Unit 4 Springerville, AZ. Rigger Supervisor: Substantial amount of Rigging with Ironwork on a daily basis. Material handling plus loading/unloading with installation of fabricate Ducts and Hoppers. Supported other Crafts load heavy equipments transport and preventative maintenance procedures on cranes.

SUMMUARY OF QUALIFICATIONS:
Over ••••• yrs. of experience working in Power Plants Constructions Coal / Gas and new or renovation construction and Shut down jobs.
Over ••••• yrs. experience of supervision in Structural Welding and Rigging, worked as Supervisory / Supervision for past employers with numerous companies like Foster Wheeler, AWS, Bechtel, Fly Ash Hauling Inc. , Irwin Industries, Kamtech, Zachary Construction; Schuff Steel Co. UB Mk Const. Power Plant Maintenance Specialist (PMSI),Teton Industries, Shaw Const. and Piping Engineer just to name a few.
In addition to my supervisory comprehension I am also skilled in Ironwork, Rigging, Bull Rigging, Boiler Maker and Welding i.e. Stick, Tig and Wire.
Past employers have recommended training seminars to increase the safety ethics and overall employee relations which I utilized.

EDUCATION:
•••••Tuba City High School Diploma Tuba City, AZ
•••••Iron Workers Apprenticeship Local Union # ••••• Phoenix, AZ
•••••Safety Recognition Awards
•••••TWIC - •••••/•••••

REFERENCES: Available upon request.